High-speed highway Ashgabat-Turkmenbashy.

Currently, in Eurasia Turkmenistan offers new kinds of models in transport - logistical field corresponding to requirements of the modern world.
In this case, an important task is to lay the foundation of a new architecture of geo-economic space uniting the Central Asia, the Caspian region, the regions of Black sea and Baltic Sea, Middle East, South and South - East Asia. Thus, the great value is given to highways.
In this context, in April 25, 2011in Ashgabat at the initiative of the Esteemed President of Turkmenistan Gurbanguly Berdimuhamedov the intergovernmental agreement has been signed on creation of a transport-transit corridor of Central Asia - Middle East.
Regarding the development of road infrastructure it is possible to ascertain with confidence, that throughout the history of the country new projects on a construction of automobile highways were not carried out with such extend.
???????? In 2014 in Turkmenistan all motorways are reconstructed, new high-speed highways with all necessary infrastructures are constructed. Their total length will make about 1700 kilometers.
At present time Turkmenbashy-Farab and Ashgabat-Dashoguz roads are under construction.
According to the development of branch program, building of highways Turkmenbashy-Farab and Ashgabat - Dashoguz, Turkmenbashy - border of Kazakhstan, Turkmenabat - Dashoguz and Mary - Serhetabat are under consideration.?
Along with building of the highways connecting different regions of the country, building of the high-speed highways corresponding to the international standards at the same time is conducted.
Their building will be carried out at three stages.
At the first stage ?? Ashgabat - Turkmenbashy,
at the second stage ?? Ashgabat - Farab and the third stage - building of a highway Ashgabat - Dashoguz.
For successful building of high-speed highways big attention is given to the foreign companies with rich experience in the given direction.
The new high-speed highway Ashgabat - Turkmenbashy starts from the 24th kilometer of the highway Ashgabat - Dashoguz.
Beginning in territory of Derweze district of Ahal region, the highway will pass to the city of Turkmenbashy. Total length of a highway is 564 km.
Highway is two-sided with width of each side - 15 meters.
On the highway it is planned to construct 9 control - check points, 9 service stations and 7 gasoline stations, and also 5 office buildings of operational service, 3 roadside hotels, parking for 20 cars, public catering establishments.
Also on a highway it is planned to construct 12 accompanying roads, 217 iron - concrete bridges.
The height of a covering of a road layer will make 1 meter 22 centimeters.